Filed under: Uncategorized
The completely resurfaced facade features Alucobond panels and an EIFS finishing system, in a color palette that meets current MINI design standards.
Filed under: Uncategorized

Step 3 – Brick Inlay; Sidewalk Installation Complete; Awaiting Final Paving.

Step 1 – Forming Concrete Curb
Filed under: Uncategorized
Retail parts store from service bay.
Stained and scored concrete floor, display lighting, and furniture (to come) will dress up the interior of the retail parts store.
Filed under: Uncategorized
The interior of the service bay is substantially complete. Tile work on columns continues.
Filed under: Uncategorized
A former overhead door was infilled to create a new aluminum store front. The concrete floor was raised to accommodate a retail parts store and car display area.
The inner layer of EIFS is comprised of the Styrofoam insulation seen here. Relief grooves provide architectural detail.
Application of brown coat and finish coat for EIFS facade. Electrical service work.
Filed under: Uncategorized
Framing for EIFS Exterior. EIFS (Exterior Insulation and Finish System) is a multi-layered exterior wall system that is used on both commercial buildings and homes. It provides superior energy efficiency and offers much greater design flexibility than other cladding products.
Inside the service bay, the partition separating Phase I and Phase II has been removed from the center of the facility in preparation for clinker tile installation.
New Retail Auto Parts Location at Drywall Phase
Filed under: Uncategorized
The slab of the second half of the service bay has been excavated, prepped, and poured.
Auto service continues in the newly renovated half of the service bay, visible through the opening in the temporary partition wall.
Before Renovation: Future site of the Retail Parts area with an opening to the service bay.
Filed under: Uncategorized
Installation of lifts complete. Notice that the wall separating the two halves of the service bay has been removed, as the transition to renovate the remaining half of the service bay begins.